CIT Construction Software Cost Planning & Bill Production

View Datasheet as PDF |
|
| |
Request Information |
| |
|
Utilising Cost Planning, a project estimate can evolve from single line Budget, through an elemental Cost Model to a detailed Cost Plan. Allowing you to react quickly as the design information is developed.
At project inception, full details of the project are entered, and a status and version assigned. These details [location, building classification, GiFA (m2)], allow the project costs to be auto-archived against defined
Where applicable, a ‘Schedule of Areas’ with their respective GiFA (m2) and number of functional units are entered. On accessing the main cost planning take-off and pricing screen, the ‘Schedule of Areas’ are clearly displayed in tabs across the screen.
CIT allows allows indicative cost per m2 rates to be assigned against those elements where no drawings are available, yet will allow measurement and pricing of items at a specified item level of detail within the same project.
At any stage, the project can be copied forward to create the next version, and the level of detail in the project amplified. At each stage, the definition and basis costing can be drawn from different sources including historic benchmarked projects, pre-defined templates, composite pricing libraries, or other marked tested sources.
Accompanying the module is a full elemental cost planning report pack in hard copy of Excel formats displaying the cost per m2, and % contribution. These can be tailored to fit with existing internal reporting methodologies.
Key Features
- Single line budgeting, elemental modelling to detailed cost plan options
- Supporting traditional 2-stage tendering and cost planning methods
- Detailed project classification & historic benchmarking available
- Measure & price at an elemental group, element or specified item level of detail
- Full versioning control through all iterations of project costing
- Multi-locational sortation views & reporting available
- Multi-level pricing on a rate, lump sum or cost per m2 basis
- Full BCIS elemental quantity cost analysis
- Project GiFA m2 and Schedule of Areas GiFA m2 cost per m2 reporting
- Supports take-off from pre-defined templates, or existing tenders
- Direct keyboard entry, spreadsheet and traditional dimensions editor
- Anding-on, DIMS copying and linking options available
- All projects auto-archived in a methodology to be re-used to describe or price new projects
CIT Bill Production
CIT has been designed to meet all contractor work winning processes needs. Where the project dictates that BQ’s are taken-off internally, these can be measured in the system in a manner similar to traditional PQS packages. This includes the ability of taking off elementally, in work packages or to any defined contract sum analysis using the powerful CIT sort routines. CIT supports a number of standard method libraries including Smm7 and CESMM3; these library structures support resource outputs to speed up the take-off to tender price submission process.
Headline Functions
- Includes Smm7 and CESMM3 libraries as standard
- Ability of taking off and reporting to any defined contract sum analysis e.g. Locations and building elements
- Definable take-off templates to speed BQ production
- Full manual and digitised take-off facilities in a traditional, and/or Excel™ like spreadsheet view available (including detailed side-cast calculations area)
- Ability to copy and link DIMS (i.e. link several items to key fundamental quantities), adds & deducts and run different measurement ‘options’/’scenarios’
- Print DIMS (individually or collectively for the project)
- A range of customisable BQ reports are available
- CITE exports available
|